Featured Projects

Proven Capabilities in the Oil & Gas Industry.

Our mission is to deliver quality services to the oil & gas industry. Our goal is to perform in a manner that emphasizes , upholds the highest standards of integrity, and results in total client satisfaction. Since our formation in 1989, we have achieved a reputation for providing quality and effective innovative solutions to our clients.

Sierrita Pipeline Project

Product: Natural Gas
Pipe OD: 36-inch
Miles: 60

view more details

Sierrita Pipeline Project ×


Product: Natural Gas
Pipe OD: 36-inch
Miles: 60
Project Description: Engineering, Mapping, Drafting, Procurement, FERC 7C permit support, Routing, Preliminary Survey, Construction Staking and As-Built Survey services. Project scope includes two measurement stations, a designed bore crossing of the US-Mexico border, an HDD crossing of the Central Arizona Project (CAP) Canal in Tucson and an HDD crossing of the Altar Wash (environmentally sensitive). In addition to a FERC 7c certificate, the project also requires a Presidential Permit.
State: AZ
Completion Year: Completed - 2014


South Texas Pipeline Project

Product: Natural Gas
Pipe OD: 42-Inch
Miles: 120

view more details

South Texas Pipeline Project ×


Product: Natural Gas
Pipe OD: 42-Inch
Miles: 120
Project Description: Owner's Engineer services through IFC Bid Package; Construction Management and Inspection Services (over 65 inspectors on-site) including Senior Construction Manager, Assistant Construction Manager, Chief Inspectors, Welding Inspectors, Coating Inspectors, Utility Inspectors, Material Coordinators, and Field Office Managers. In 2014 EnSiteUSA inspection staffing peaked at approximately 70 inspectors and in 2015 inspection staffing peaked at approximately 50 inspectors for the NET Mexico Project.
State: TX
Completion Year: In-Progress


Confidential Client Pipeline Project

Product: NGL
Pipe OD: 30 inch
Miles: 120

view more details

Confidential Client Pipeline Project ×


Product: NGL
Pipe OD: 30 inch
Miles: 120
Project Description: Engineering services including Conceptual Pipeline Study, Desktop Route Selection, Project Schedule, Project Cost Estimate, Long Lead Material and Equipment, Risk Analysis, ROW Execution Plan, and Project Permitting Analysis.
State: Confidential
Completion Year: Completed - 2014


Southern Indiana Market Lateral Pipeline Project

Product: Natural Gas
Pipe OD: 20-inch
Miles: 30

view more details

Southern Indiana Market Lateral Pipeline Project ×


Product: Natural Gas
Pipe OD: 20-inch
Miles: 30
Project Description: Front-End Engineering, Detailed Engineering, Mapping, Routing, Preliminary Survey, Construction Staking, As-built Survey, Construction Management, Inspection, and Land services. Project scope includes preliminary design phase work to develop the project for a FERC 7c filing. The project will require a major pipeline crossing of the Ohio River.
State: KY, IN
Completion Year: Completed - 2015


Tuscarora Pipeline Project

Product: Natural Gas
Pipe OD: 16-inch
Miles: 15

view more details

Tuscarora Pipeline Project ×


Product: Natural Gas
Pipe OD: 16-inch
Miles: 15
Project Description: Engineering, Mapping, Routing, FERC 7c permit support, Survey, Construction Staking, As-Built Survey, As-Built Drafting services for a pipeline in New York.
State: NY
Completion Year: In-Progress


Southeast Market Expansion Pipeline Project

Product: Natural Gas
Pipe OD: 30-inch and 24-inch
Miles: 70

view more details

Southeast Market Expansion Pipeline Project ×


Product: Natural Gas
Pipe OD: 30-inch and 24-inch
Miles: 70
Project Description: Construction Staking, As-Built Survey and As-Built Drafting services for the Southeast Market Expansion; a FERC 7c Project.
State: AL, MS
Completion Year: Completed - 2015


Paradise Pipeline Project

Product: Natural Gas
Pipe OD: 20-inch
Miles: 19

view more details

Paradise Pipeline Project ×


Product: Natural Gas
Pipe OD: 20-inch
Miles: 19
Project Description: Front-End Engineering, Mapping Routing, Preliminary Survey, and Land services. Project scope includes preliminary design phase work to develop the project for a FERC 7c filing.
State: KY
Completion Year: Completed - 2016


Northline Pipeline Project

Product: NGL
Pipe OD: 16, 10 and 8-inch
Miles: 134

view more details

Northline Pipeline Project ×


Product: NGL
Pipe OD: 16, 10 and 8-inch
Miles: 134
Project Description: Preliminary Survey, GIS, Mapping, Construction Staking and As-Built Survey services.
State: KS, OK
Completion Year: In-Progress


Gallagher Power Plant Pipeline Project

Product: Natural Gas
Pipe OD: 20-inch
Miles: 20

view more details

Gallagher Power Plant Pipeline Project ×


Product: Natural Gas
Pipe OD: 20-inch
Miles: 20
Project Description: Front-end Engineering design, FERC 7c permit support, Mapping Routing, Preliminary Survey, and Land services for a pipeline to serve Gallagher Power Plant. The scope of work includes a horizontal directionally drilled crossing of the Ohio River in addition to 21 stream crossings, 9 road and one railroad crossings, an interconnect and a delivery M&R station at the Gallagher Power Plant.
State: IN, KY
Completion Year: Completed - 2011


Liberty Pipeline Project

Product: Natural Gas
Pipe OD: 36-inch
Miles: 9

view more details

Liberty Pipeline Project ×


Product: Natural Gas
Pipe OD: 36-inch
Miles: 9
Project Description: Front-End Engineering, Mapping, Routing, FERC 7c application support services, Preliminary Survey, and Land services for the onshore pipeline to deliver 2.4 BCFD of degasified LNG from an offshore Deep Water Port Facility to interconnects in Linden, New Jersey.
State: NJ
Completion Year: Completed - 2011


Mississippi Pipeline Project

Product: Natural Gas
Pipe OD: 36-inch
Miles: 95

view more details

Mississippi Pipeline Project ×


Product: Natural Gas
Pipe OD: 36-inch
Miles: 95
Project Description: Engineering, Mapping, Procurement, Survey, Land Acquisition and Construction Support services for a FERC 7c Project.
State: MS
Completion Year: Completed - 2009


Big Sandy Pipeline Project

Product: Natural Gas
Pipe OD: 20-inch
Miles: 60

view more details

Big Sandy Pipeline Project ×


Product: Natural Gas
Pipe OD: 20-inch
Miles: 60
Project Description: Engineering, Mapping, Procurement, Survey and Construction Staking services for 60 miles of 20-inch pipeline; a FERC 7c Project.
State: KY
Completion Year: Completed - 2007


Lobos Pipeline

Product: CO2
Pipe OD: 16-inch
Miles: 213

view more details

Lobos Pipeline ×


Product: CO2
Pipe OD: 16-inch
Miles: 213
Project Description: Preliminary Survey services for a 213 mile 16-inch pipeline.
State: AZ, NM
Completion Year: Completed - 2014


St. Clair Compressor Station

Station Horsepower (HP): 19,000
No. of Units: 4
Compressor: Neumann & Esser

view more details

St. Clair Compressor Station ×


Station Horsepower (HP): 19,000
No. of Units: 4
Engine Type: GE Waukesha 275GL+
Compressor: Neumann & Esser
Project Description: FEED study, major equipment specifications and owner’s engineer services for the project management, engineering, major equipment specification, architectural building layouts, site survey, drafting, construction support, start-up assistance and commissioning; includes design integration of two existing centrifugal and reciprocating compressor stations and dehydration.
State: MI
Completion Year: In Progress


Rex Booster Compressor Station

Station Horsepower (HP): 14,250
No. of Units: 3
Compressor: Ariel 3616/JGC-6-1

view more details

Rex Booster Compressor Station ×


Station Horsepower (HP): 14,250
No. of Units: 3
Engine Type: Caterpillar G3616LE
Compressor: Ariel 3616/JGC-6-1
Project Description:
State: OH
Completion Year: Completed - 2015


Poorman Compressor Station

Station Horsepower (HP): 2,760
No. of Units: 2
Compressor: Ariel Reciprocating

view more details

Poorman Compressor Station ×


Station Horsepower (HP): 2,760
No. of Units: 2
Engine Type: Caterpillar G3516
Compressor: Ariel Reciprocating
Project Description: Project Description: Project management, engineering, equipment specification and drafting services; includes process hazard analysis (PHA).
State: PA
Completion Year: Completed - 2015


West Texas Gathering System (six compressor stations)

Station Horsepower (HP): 15,180 (Total)
No. of Units: 11 (Total)
Compressor: Ariel Reciprocating

view more details

West Texas Gathering System (six compressor stations) ×


Station Horsepower (HP): 15,180 (Total)
No. of Units: 11 (Total)
Engine Type: 10 – Waukesha 5794 and 1- electric drive
Compressor: Ariel Reciprocating
Project Description: Project management, engineering and drafting services for six grassroots compressor stations for West Texas field gathering system.
State: TX
Completion Year: Complete - 2014


Stem Compressor Station

Station Horsepower (HP): 1,200
No. of Units: 1
Compressor: Solar Centrifugal

view more details

Stem Compressor Station ×


Station Horsepower (HP): 1,200
No. of Units: 1
Engine Type: Solar Saturn
Compressor: Solar Centrifugal
Project Description: Project management, engineering, equipment specification, drafting, automation design, and construction support and inspection services.
State: NC
Completion Year: Completed - 2014


Roxboro Compressor Station

Station Horsepower (HP): 3,200
No. of Units: 3
Compressor: Solar Centrifugal

view more details

Roxboro Compressor Station ×


Station Horsepower (HP): 3,200
No. of Units: 3
Engine Type: Solar Saturn
Compressor: Solar Centrifugal
Project Description: Project management, engineering, equipment specification, drafting, automation design, and construction support and inspection services.
State: NC
Completion Year: Completed - 2013


Dunbar Compressor Station

Station Horsepower (HP): 4,750
No. of Units: 1
Compressor: Ariel Reciprocating

view more details

Dunbar Compressor Station ×


Station Horsepower (HP): 4,750
No. of Units: 1
Engine Type: Caterpillar G3616
Compressor: Ariel Reciprocating
Project Description:
State: NY
Completion Year: Completed - 2013


Teel Road Compressor Station

Station Horsepower (HP): 1,380
No. of Units: 1
Compressor: Ariel Reciprocating

view more details

Teel Road Compressor Station ×


Station Horsepower (HP): 1,380
No. of Units: 1
Engine Type: Caterpillar G3516
Compressor: Ariel Reciprocating
Project Description: Engineering, drafting and construction support services.
State: PA
Completion Year: Complete - 2012


Magnolia Compressor Station

Station Horsepower (HP): 3,550
No. of Units: 1
Compressor: Ariel Reciprocating

view more details

Magnolia Compressor Station ×


Station Horsepower (HP): 3,550
No. of Units: 1
Engine Type: Caterpillar G3612
Compressor: Ariel Reciprocating
Project Description: Project management, engineering, equipment specification, procurement, drafting, and construction support and inspection services.
State: KY
Completion Year: Completed - 2012


Center Compressor Station

Station Horsepower (HP): 2,070
No. of Units: 2
Compressor: Ariel Reciprocating

view more details

Center Compressor Station ×


Station Horsepower (HP): 2,070
No. of Units: 2
Engine Type: Caterpillar G3508 & G3516
Compressor: Ariel Reciprocating
Project Description: Project management, engineering, equipment specification, procurement, drafting, and construction support and inspection services.
State: KY
Completion Year: Completed - 2012


NS1 Compressor Station

Station Horsepower (HP): 15,000
No. of Units: 1
Compressor: Solar Centrifugal

view more details

NS1 Compressor Station ×


Station Horsepower (HP): 15,000
No. of Units: 1
Engine Type: 13.2kV Converteam VFD
Compressor: Solar Centrifugal
Project Description: Project management, engineering, equipment specification, procurement, drafting and construction support services; include 230kV to 13.2kV substation.
State: NY
Completion Year: Completed - 2011


NS2 Compressor Station

Station Horsepower (HP): 30,000
No. of Units: 2 (future 3rd unit)
Compressor: Solar Centrifugal, Dresser-Rand Centrifugal

view more details

NS2 Compressor Station ×


Station Horsepower (HP): 30,000
No. of Units: 2 (future 3rd unit)
Engine Type: 13.2kV Converteam VFD and Siemens 13.2kV VFD
Compressor: Solar Centrifugal, Dresser-Rand Centrifugal
Project Description: Project management, engineering, equipment specification, procurement, drafting and construction support services; includes 115kV to 13.2kV substation.
State: PA
Completion Year: Completed - 2011


NACS1 Compressor Station

Station Horsepower (HP): 6,900
No. of Units: 5
Compressor: Ariel Reciprocating

view more details

NACS1 Compressor Station ×


Station Horsepower (HP): 6,900
No. of Units: 5
Engine Type: Caterpillar G3516B LE
Compressor: Ariel Reciprocating
Project Description:
State: PA
Completion Year: Completed - 2011


Bradford West M&R Station

Product: Natural Gas
Volume: 500 MMSCFD
Meter Type: Ultrasonic
State: PA
Completion Year: 2014

view more details

Bradford West M&R Station ×


Product: Natural Gas
Volume: 500 MMSCFD
Meter Type: Ultrasonic
Project Description: Filter separator, measurement, flow control, SCADA. Provided project management, engineering, design drafting, procurement and field support services.
State: PA
Completion Year: 2014


Susquehanna M&R Station

Product: Natural Gas
Volume: 250 MMSCFD
Meter Type: Ultrasonic
State: PA
Completion Year: 2014

view more details

Susquehanna M&R Station ×


Product: Natural Gas
Volume: 250 MMSCFD
Meter Type: Ultrasonic
Project Description: Filter separator, measurement, flow control, SCADA. Provided project management, engineering, design drafting, procurement and field support services.
State: PA
Completion Year: 2014


Trout Run M&R Station

Product: Natural Gas
Volume: 500 MMSCFD
Meter Type: Orifice
State: PA
Completion Year: 2012

view more details

Trout Run M&R Station ×


Product: Natural Gas
Volume: 500 MMSCFD
Meter Type: Orifice
Project Description: Pig receiver, filter separators, water bath heaters, dehydration, measurement, regulation. Provided project management, engineering, design drafting and procurement services.
State: PA
Completion Year: 2012


Gamble Pad A Meter Station

Product: Natural Gas
Volume: 60 MMSCFD
Meter Type: Ultrasonic
State: PA
Completion Year: 2012

view more details

Gamble Pad A Meter Station ×


Product: Natural Gas
Volume: 60 MMSCFD
Meter Type: Ultrasonic
Project Description: Slug catcher, ultrasonic meter, odorization, dehydration and pig launcher. Provided engineering and design drafting services.
State: PA
Completion Year: 2012


Empire Connector M&R Station

Product: Natural Gas
Volume: 250 MMSCFD
Meter Type: Ultrasonic
State: PA
Completion Year: 2012

view more details

Empire Connector M&R Station ×


Product: Natural Gas
Volume: 250 MMSCFD
Meter Type: Ultrasonic
Project Description: Pig receiver, filter separator, water bath heaters, ultrasonic measurement, regulation. Provided project management, engineering, design drafting and procurement services.
State: PA
Completion Year: 2012


San Joaquin Road Receipt M&R Station

Product: Natural Gas
Volume: 200 MMSCFD
Meter Type: Ultrasonic
State: AZ
Completion Year: 2014

view more details

San Joaquin Road Receipt M&R Station ×


Product: Natural Gas
Volume: 200 MMSCFD
Meter Type: Ultrasonic
Project Description: Filter separator, measurement, regulation/flow control. Provided project management, engineering, design drafting, procurement and survey services.
State: AZ
Completion Year: 2014


Sasabe Delivery M&R Station

Product: Natural Gas
Volume: 200 MMSCFD
Meter Type: Ultrasonic
State: AZ
Completion Year: 2014

view more details

Sasabe Delivery M&R Station ×


Product: Natural Gas
Volume: 200 MMSCFD
Meter Type: Ultrasonic
Project Description: Filter separator, measurement, regulation/flow control. Provided project management, engineering, design drafting, procurement and survey services.
State: AZ
Completion Year: 2014


Burnett Ranch M&R Station

Product: CO2
Volume: 67 MMSCFD
Meter Type: Orifice
State: TX
Completion Year: 2014

view more details

Burnett Ranch M&R Station ×


Product: CO2
Volume: 67 MMSCFD
Meter Type: Orifice
Project Description: 7.3 miles of 10-inch CO2 pipeline, launcher, receiver, measurement, regulation/flow control. Provided engineering, design drafting, procurement, survey and as-built survey services.
State: TX
Completion Year: 2014


Boardwalk Pipeline Partners

Project: Southern Indiana Market Lateral
State: IN, KY
Completion Year: Completed - 2014

view more details

Boardwalk Pipeline Partners ×


Project: Southern Indiana Market Lateral
Project Description: Provide land services for FERC 7(c) application for 30 miles of 20” natural gas pipeline including ROW project management, survey permitting, title examination, data tracking and document control, and determination of non-environmental permit requirements. Participate in FERC scoping meetings and other community/government relations activities.
State: IN, KY
Completion Year: Completed - 2014


Boardwalk Pipeline Partners

Project: Western Kentucky Market Lateral
State: KY
Completion Year: Completed - 2014

view more details

Boardwalk Pipeline Partners ×


Project: Western Kentucky Market Lateral
Project Description: Provide land services for FERC 7(c) application for 20 miles of natural gas pipeline including ROW project management, survey permitting, title examination, data tracking and document control, and determination of non-environmental permit requirements. Participate in FERC scoping meetings and other community/government relations activities.
State: KY
Completion Year: Completed - 2014


SCANA

Project: PSNC T-021B Pipeline
State: NC
Completion Year: Complete - 2013-2014

view more details

SCANA ×


Project: PSNC T-021B Pipeline
Project Description: Provide land services for natural gas pipeline including ROW project management, assistance with route selection, survey permits, survey assistance, title search, easement acquisition, maintain construction line list and provide support during construction, settle construction damages and document administration.
State: NC
Completion Year: Complete - 2013-2014


Energy Transfer

Project: West Expansion Phase II
State: TX
Completion Year: Completed - 2011-2014

view more details

Energy Transfer ×


Project: West Expansion Phase II
Project Description: Support ongoing operations activities including coordinating hydrotest activities, acquisition of CP ground bed sites, coordinating right of way maintenance activities and damage negotiations and settlements.
State: TX
Completion Year: Completed - 2011-2014


Southern California Gas Company

Project: Multiple
State: CA
Completion Year: Completed - 2011-2014

view more details

Southern California Gas Company ×


Project: Multiple
Project Description: Provide land services from total project support to single tasks as needed to acquire and maintain legal rights necessary for the construction and/or continued operation of pipelines, pump stations, meter sites and related appurtenances.
State: CA
Completion Year: Completed - 2011-2014


ConocoPhillips

Project: Eagle Ford - Multiple Pipelines
State: TX
Completion Year: Completed - 2010-2014

view more details

ConocoPhillips ×


Project: Eagle Ford - Multiple Pipelines
Project Description: Provide land services for multiple projects including route selection, permitting review, survey permits, survey assistance, agency review and title search, easement acquisition, maintain construction line list, provide support during construction, obtain crossing permits, settle construction damages and document administration.
State: TX
Completion Year: Completed - 2010-2014


Magellan Midstream

Project: Multiple
State: NE, KS, MO, IL
Completion Year: Completed - 2010-2014

view more details

Magellan Midstream ×


Project: Multiple
Project Description: Support ongoing operations activities including ownership updates, coordination of easement maintenance, damage negotiations and settlements, CP easement acquisition, document administration and document control.
State: NE, KS, MO, IL
Completion Year: Completed - 2010-2014


Kinder Morgan

Project: REX-Entrega
State: CO, WY
Completion Year: Completed - 2004-2007

view more details

Kinder Morgan ×


Project: REX-Entrega
Project Description: Managed land activities on 327 miles of 30" and 36" natural gas pipeline (FERC Project). Negotiation and acquisition of easements, access roads, rail sidings, pipe yards and contractor yards. Acquired non-environmental permits. Participated in public meetings. Supported construction activities. Negotiated and settled damage payments.
State: CO, WY
Completion Year: Completed - 2004-2007


Longhorn Partners

Project: Longhorn Partners Pipeline
State: TX
Completion Year: Completed - 2004

view more details

Longhorn Partners ×


Project: Longhorn Partners Pipeline
Project Description: Supported land activities on 694 mile conversion project for a products pipeline during pre-commissioning, line cleaning, line repair/replacement, pump station refurbishing, hydrotesting and commissioning.
State: TX
Completion Year: Completed - 2004


Williston Basin

Project: Grasslands Pipeline
State: WY, SD, MT
Completion Year: Completed - 2003

view more details

Williston Basin ×


Project: Grasslands Pipeline
Project Description: Supported land activities on 253 mile, natural gas FERC project.
State: WY, SD, MT
Completion Year: Completed - 2003


Dominion Energy

Project: Greenbriar Pipeline
State: WV, VA, NC
Completion Year: Completed - 2001-2003

view more details

Dominion Energy ×


Project: Greenbriar Pipeline
Project Description: Managed land services on 263 mile, 36" natural gas pipeline (FERC) project. Worked with landowners, engineers and multiple government agencies on routing, survey permissions and support, title research, easement acquisition, non-environmental permit acquisition and pre-construction damage negotiations and settlements. Document control, document administration and check administration. Project received FERC certificate but was halted prior to start of construction due to loss of client for product.
State: WV, VA, NC
Completion Year: Completed - 2001-2003


Sunoco Logistics Partners

Project Description: Construction management, environmental and general inspection for ILIs, IMP work and relocation throughout Michigan, Ohio, Pennsylvania, Oklahoma and Texas. 22” Lima-Samaria pipeline relocation, Chester Creek 8” pipeline relocation project, Akron Cleveland 10” relocation project, Bay Creek project, Mainer East project, Shocke drain project, Mid-Valley 22” pipeline relocation project and Massport Jet Fuel 8” pipeline relocation project.


NET Mexico

Project Description: Inspection for meter station, compressor station & 124 miles of 42” and 36” pipeline in the South Texas region.


Chaparral

Project Description: Construction management and general inspection for grassroots compression stations and for the Coffeyville 8” pipeline.


Chief Oil & Gas

Project Description: Construction management and general inspection for 30 miles of 24” pipe.


Hilcorp Energy Company

Project Description: Construction management and general inspection for Harvest Pipeline Gardendale project.


Inergy Midstream LLC

Project Description: Construction management and general inspection for COLT loading / unloading facility and Arrow storage tank facility.


Markwest Energy Appalachia, LLC

Project Description: Construction management and general inspection for Ranger Pipelines, 37.5 miles of 8” pipeline.


Antero Resources Corporation

Project Description: Construction management and general inspection for VGS pigging WD 79 – DGS.


Piedmont Natural Gas

Project Description: Construction management and general inspection for inspection services in North Carolina for 127 miles of 20” pipeline, 5 miles of 16” pipeline, 11.5 miles of 10” pipeline, 9 miles of 12” pipeline, 10 miles of 20” pipeline, a meter station and two compressor stations.


Boardwalk Pipeline Partners

Project Description: Construction management and general inspection for all inspection projects.


Access Midstream

Project Description: Construction management, environmental and general inspection in the Marcellus Shale in the Towanda and Beaver, PA areas and the Valley Grove and Wheeling, WV areas.


Iberdrola USA

Project Description: Construction management and general inspection for Seneca West PL interconnect.


Centerpoint Energy

Project Description: General inspection in the Kingsville, TX area.


Spectra Energy

Project Description: Functional survey coordination and general inspection on the Atlantic Bridge / AIM Project. Take up and re-lay approximately 112 miles of pipeline from 26” to 42” and add 90,000 HP of compression.


Kinder Morgan

Project Description: Chief inspection on the West Clear Lake brine storage pump. Removal and replacement and welding inspection on the Invenergy Nelson Interconnect Project, Station 311 Unitized Cooling Project and the AMA #4 Project.


Targa Pipeline

Project Description: Construction management and general inspection for 28 miles of 12” Patriot pipeline, 10” Arbuckle pipeline, Water Well Line #5 pipeline, salt well disposal, valve manifold, EquiStar interconnect, DCP 16” interconnect and Dupont interconnect. Relocation of 6” GATX pipeline, sound terminal pipeline/booster/meter station and the ONEOK propane hub connection.


PSNC Energy

Project Description: Chief inspection at the Stem and Roxboro compressor stations.


NIPSCO

Project Description: Welding inspection and quality assurance on the 112th Street alternative gas feed project.


EXP

Project Description: Route 120 miles of pipeline from North Dakota into Canada.


LG&E

Project Description: Cane Run 24” pipeline project, riser replacement program in the greater Louisville area, and the task investment project.


Chesapeake

Project Description: Construction management and inspection throughout Kentucky, including the Kermit, Burning Creek, Evans Fork and Buckingham compressor stations, as well as the BM-22, G-77, P-2, B-147 and P-8 lines.


Anadarko

Project Description: Delaware Basin project in West Texas.


Columbia Gas

Project Description: Chief inspection at the Hancock compressor station, the Artemas compressor station bypass and insulators, as well as the Artemas compressor station – a field dehydration upgrade.


EOG

Project Description: General inspection in the Eagle Ford Shale area. Gillett, Jourdanton and Gonzales, TX on 6” to 20” pipeline, meter sites, compressor stations, well pad connections and interconnects.


PVR

Project Description: Bradford West interconnect and Susquehanna interconnect meter skids and pipeline and the Hirkey Silencer and McGregor interconnect compressor stations.