Home > Projects > Transmission Pipeline System Replacement
Previous
Next
Transmission Pipeline System Replacement
Replace 32 miles of aging 20″ and 26″ with new 36″ pipe co-located with an existing 30″ pipe to remain in service. Upgrade and tie into existing compressor stations.
Location: Kansas
Total Install Cost Estimating and Scope Development FERC 7 ( c ) filing
Pipeline and compression system evaluation
Replace and re-connect multiple laterals
Redesign and upgrade both storage field compressor stations