Transmission Pipeline System Replacement
Previous
Next
Transmission Pipeline System Replacement
Replace 32 miles of aging 20″ and 26″ with new 36″ pipe co-located with an existing 30″ pipe to remain in service. Upgrade and tie into existing compressor stations.
- Location: Kansas
- Total Install Cost Estimating and Scope Development FERC 7 ( c ) filing
- Pipeline and compression system evaluation
- Replace and re-connect multiple laterals
- Redesign and upgrade both storage field compressor stations
- Completion Year: 2020
Challenges
- Complex system evaluation
- Various types of compression to analyze
- Multiple pipeline MAOPs